![]() ![]() |
|||||||||||||||||||||||||||||||||||
|
|
|
Flumes shall be supplied with integral Foam Reinforcing Ribs and Top Stiffener Angles as required by Flume size.
INSTALLATION REQUIREMENTS The Parshall flume is intended for use in open channels such as irrigation ditches. Use extreme care when adapting Parshall flumes for use with round pipes. The flume's crest is usually set at an elevation higher that the floor of the upstream channel. A variety of factors influence the selection of the crest elevation. When designing a metering station it is best to follow the recommendations of a knowledgeable professional in the field. Parshall flumes may be set in earth or concrete or bolted to companion structures using the 2-inch flange provided on each end. When pouring concrete it is advisable to brace the flume internally with 2" x 4" blocks cut to size. This temporary bracing will prevent bulging of the sidewalls. Remove the braces after the concrete has set.
[H Flumes/Trapezoidal Flumes] [Metering Manholes] [Specifications & Installation Instructions] [Frequently Asked Questions] [Water & Waste Links] [Contact and Information Request]
8270 South Kyrene Road
|
|||||||||||||||||||||||||||||||||